Get Everything Your Switch Campus Needs, from One Vendor

Switch campuses are scaling fast across seven locations. Ensure access to the fiber, cable management, and grounding infrastructure your builds need, from a vendor who can ship it now. — Panduit. Book a session now with an expert to get ahead.

THREE Infrastructure Categories.

01Fiber
02Grounding
03Cable Management

ONE P.O.

Built on Partnerships You Already Trust

Nvidia Logo
Dell Technologies Logo
Cisco Logo
Motivair Logo
Sunbird Logo

NVIDIA-validated: Blackwell GB200 & GB300 NVL72 and DGX SuperPOD reference architectures.

Resources at the Ready

11

US Manufacturing Plants

1.3K

Distributor Network

Quick Ship Fiber Program

Keep projects on schedule with pre-qualified end-to-end fiber configurations that ship in 10 business days.

View Quick Ship Options
 

Three Forces Shaping Every Site 

Schedule Risk

$14M/month


The cost of delay on a typical 60 MW build. Speed is the currency.

Source

Labor Shortages

81K


The annual US electrician shortage. Electrical work is 45 - 70% of build cost.

Source

Supply Bottlenecks

~50%


Percentages of 2026 US data centers delayed or cancelled.

Source

 

Why Teams Building for Switch Choose Panduit

Icon-1

Your Switch Build, Kitted From One PO

Fibe, grounding and cable management on one master agreement. Site-kits arrive ready to install, no hunting parts across twelve POs. 

Icon-2

A Dedicated Team,
Not Just a Vendor

You get a strategic account manager, territory manager, technical sales engineer, and customer experience ready to support your Switch build — one team accountable from design through deployment.

Icon-3

NVIDIA-Validated for Every Switch EVO AI Factory

MPO Base-16, VSFF connectors, and Opti-Core® fiber are sized for Blackwell density. Switch's EVO AI Factory design is built to support every generation of NVIDIA reference design — and Panduit's fiber is validated for it.

Icon-4

Safer Commissioning, Faster Revenue

Verify absence of voltage before anyone touches a live conductor. VeriSafe absence-of-voltage speeds up testing and makes arc-flash PPE optional at energization. 

Icon-5

On-time Installation Success Made Easy

Site success involves more than just about receiving parts on time. Get the right mix of technology that allows your crews to install faster and more reliably. OmniSplice’s 2-minute terminations help you reduce rework and total installed cost. 

Power Distribution Units

Power Distribution Units

Flexible power with real-time visibility

Uninterrupted Power Supply Systems

Uninterrupted Power Supply Systems

Always-on protection when power fails 

Fault Managed Power Systems

Fault Managed Power Systems

Deliver power safely over longer distances 


Intelligent Rack Power 

What Really Matters in Intelligent Rack Power 

Get clarity on the capabilities that influence monitoring, integration, security, and performance in real-world data center conditions.

Download Now

Intelligent Rack Power 

What Really Matters in Intelligent Rack Power 

Get clarity on the capabilities that influence monitoring, integration, security, and performance in real-world data center conditions.

Download Now

 

COOLING & STRUCTURE

When Density Pushes Hard, Structure Matters 

The physical structure to keep performance steady

Keep heat, hardware, and cabling in check by designing the physical layer as a system. Liquid cooling pulls heat from the rack. Cabinets and racks preserve airflow and access as loads rise, and protected pathways keep cabling secured and out of the airstream. These elements translate into easy scaling and predictable operations.

Cooling & Structure
 
Direct to Chip Cooling

Liquid Cooling Solutions

Rack-level heat removal for high-density data centers 

Cabinets and Racks

Cabinets and Racks

Structured support for dense, 
hot environments

Pathways

Pathways

Protected pathways that
preserve airflow


AI is Stress-testing

AI Is Stress-Testing Your Data Center

Get clear answers on how AI reshapes cooling, fiber, and rack design and what you need to change now to support high-density workloads.

Download Now

AI is Stress-testing

AI Is Stress-Testing Your Data Center

Get clear answers on how AI reshapes cooling, fiber, and rack design and what you need to change now to support high-density workloads.

Download Now

Block 4
editable text

By Invitation • Limited Availability

Sit Down with the Engineers Behind the Roadmap

A private visit to the Panduit Experience Center (PEC) is engineers talking to engineers — not a sales call. Get one-on-one access to the people who build Panduit products in an on-site peer-to-peer experience.

R&D
Direct to the lab
Product Management
Shape the roadmap
Technical Teams
Solve your build
Preview of the Panduit Experience Center promo video

Built for every role


Power and Electrical

Ship the grounding and safety stack off one P.O.: StructuredGround systems, cable management, and VeriSafe AVT — the safety system that lets your crews skip arc-flash PPE at energization.


Construction Management

Receive kitted fiber, grounding, and cable management as a single site delivery to help your crews install, not hunt. Pre-manufactured sub-assemblies cut on-site labor 30–50% per shift.


Connectivity and Design

Write a BOD that's still defensible in two refresh cycles. Panduit's MPO Base-16, VSFF, and Opti-Core® fiber are sized for Switch's EVO AI Factory density, validated for NVIDIA's DGX-Ready and Blackwell reference designs.


Procurement and Sourcing

Stop qualifying vendors across multiple categories. Panduit consolidates fiber, cable management, and grounding into one master agreement.


Speed to Revenue Starts with the Right Partner

AI infrastructure doesn’t wait, and neither should you. Panduit equips your teams with everything needed to build faster, safer, and without compromise.



 
This solution has revolutionized our approach to power provisioning for future racks and equipment. It’s clarified circuit identification, alleviated underfloor congestion, and it’s a leap forward that we achieved in partnership with Panduit. Without this innovation, we would still be entrenched in traditional, time-consuming methods.

— Gustavo Aldaba
Network Manager & Consultant for University of Illinois Health


Block 1
editable text
Block 2 Top
editable text
Block 2 Bottom
editable text
grows to fill column
Block 3 Top
editable text
Block 3 Bottom
editable text
grows to fill column
Block 4
editable text
Block 1
editable text
Block 2 Top
editable text
Block 2 Bottom
editable text
grows to fill column
Block 3 Top
editable text
Block 3 Bottom
editable text
grows to fill column
Block 4
editable text